Energy Cost

Your bill is decided on your panel, in kilowatts.

One 15-minute peak sets the demand charge for the month, and the loads that run when nobody is in set much of the rest. We meter both at the board, bring the peak down, switch off what should not be running, and read the panel again to show it.

DeterminationSpecimen

Peak Determination, Main Service

12 months of utility interval data
Set by
Morning start-up
Interval
07:15 to 07:30
What set the peak

Three rooftop units start inside the same 15 minutes. Staggering them removes the interval that set the charge.

Reviewed by an engineer and not signed

Two Charges on One Bill

A commercial electricity bill carries two charges that respond to different things, and both are decided on the panel.

The highest 15 minutes set the month's chargeTHE AREA IS THE ENERGY YOU BUY00:0006:0012:0018:0024:00DEMAND, ONE DAY

A shape, and it describes no particular facility. Interval length, time-of-use windows and ratchets vary by utility and by tariff.

The peak, and the hours nobody is in

The energy charge bills the kilowatt-hours used across the month, the area under the curve. The demand charge bills the highest average demand in any single 15-minute interval, whatever the rest of the month looked like.

Equipment starting together in the morning sets the second. Lighting, ventilation and a circuit nobody can name running through the night set a large share of the first. Neither shows on the bill as a circuit; both show on the panel.

So the work is done at the board: meter each circuit, find the interval and the hours, change what runs when, and read the panel again.

Where the Kilowatts Come Off

At the peak

Loads that land in the same 15 minutes and need not: staggered, interlocked or held under a limit, so the interval that set the charge no longer does.

After hours

Lighting, ventilation and setpoints that run as though the facility were open, and the circuit nobody can account for. Scheduled, set back or retired.

All day

Equipment drawing above its duty: a fan at full speed for partial load, a dirty coil, a motor past its service. Repaired, slowed or corrected, and read again.

What We Answer

How We Do It

  1. Utility account connectedEvery 15-minute reading of the year, with the tariffHighest 15 minutes of each month, in kW0200400600JFMAMJJASOND510 kWHighest charge01 Utility data

    We read 12 months of your utility's interval data and find the interval that set each month's charge.

  2. 0200400600kW12 am6 am12 pm6 pm12 amDemand on the peak day4:45 to 5:00 pmThe 15 minutes August is billed on02 The interval

    We place the peak in its day and its week, so it is clear when it lands and how often it returns.

  3. 510 kWAugust's peak, on a Friday at 4:45 pmLife safetyCentral coolingLightingGuest roomsElevatorsLaundryWater heatingKitchenPool and spa03 Causes

    We split the peak by circuit, from the panel record, and read a circuit directly wherever it was measured.

  4. 0200400600kW12 am6 am12 pm6 pm12 amGuest charging from check-inToday's peak, 510 kWNew peak, 572 kW, charge up 12%8 chargers, 62 kW04 Cost

    We price the charge on your own tariff, as it is today and with the load you are adding.

Watch a peak being determined →

After Hours, on the Panel

Day
Changes
Closed00:0006:0012:0018:0024:00
Measured, with the changes chosenDrawn for nothing
1,647 kWhThe day as it is measured today

An office block at 2 am

Four floors over a lobby and a car park, open 6 am to 9 pm on weekdays. Its bill says what the week cost. It cannot say which floor, which hours or which machine.

Metered on the panel, most of what nobody can account for is drawn while nobody is in, or by equipment working harder than the day needs. Switch each change on and the day answers.

For what usually sets the peak at a property, a grocery, a plant or a hotel, see Lower Demand Charges.

What We Measure

12 months of interval data

Every 15-minute interval of the year, the same intervals your demand charge is billed on, with the tariff that prices them.

A month on the main boards

Loggers on the main boards and the key circuits for a month, so each load is read where it draws, at the peak and through the night.

The panel, circuit by circuit

The breaker list typed from photographs of the board, so a kilowatt at 2 am has a circuit name against it and not a guess.

Loggers are fitted and collected by a licensed electrician with the panel live, and they come off at the end of the window. Each change is read again at its own circuit the month after it is made.

Who Asks for It

  • GroceryCases starting together
  • Cold storeCompressors at the peak
  • HotelThe afternoon peak
  • OfficeLights on at 2 am
  • ManufacturingLines starting at once
  • GymThe morning start-up
  • WarehouseCharging at shift change
  • SchoolHeating before opening

What You Receive

  1. The peaks, month by month

    The interval that set each month's charge, with its date and time.

    From 12 months of interval data
  2. What set each one

    The loads running in that interval, named from the panel record, and what draws when the facility is closed.

    Reviewed by an engineer
  3. Each change, read at its circuit

    The peak and the after-hours load measured again after the changes, against the month before.

    Every month the rules run

What It Needs

Energy Cost reads 12 months of your utility's interval data and meters the main boards for a month, so each load is read where it draws.

The daily rules run on a controller as schedules, interlocks and setpoint limits an engineer wrote and signed. It is ours, run by us, and every action it takes can be traced to a rule.

Demand charges higher than they should be? Start with the panel you have.

Energy Cost | Wattif