The approach

A load study shouldn’t take six weeks and a consultant.

Traditional firms sell hours: site walks, spreadsheets, weeks of waiting. Wattif rebuilds your electrical system as a verified model, runs the NEC 220.87 math on your own measured demand, and a licensed engineer seals the package. Fixed price per report. Most come back in 3 days.

When we meter · the on-site path

Three steps. 30 days. One answer.

  1. 01 · Day 0

    Sensors go on the panel

    A contractor mounts CT clamps on your mains and feeders, typically under an hour on site. No shutdown, no rewiring, no disruption to the facility.

  2. 02 · Day 1 to 30

    30 days of evidence

    We monitor exactly what your study needs: the mains, one feeder, or several panels across the site. Real kilowatt data at 1 to 15 minute resolution, matched to the question.

  3. 03 · Day 30

    The determination, sealed

    The recorded peak is taken to 125% under NEC 220.87 and set against the rating of the service or the feeder the load is going on. A licensed engineer reviews and seals it. You get the answer in plain language, with the numbers behind it.

Your other options

How else would you get this answer?

There are three ways to get a permit-ready load study today. Two of them cost more and take longer.

Engineering consultant

$5,000 to $15,000 · 4 to 6 weeks

Hourly billing, a site walk to redraw what your documents already show, and the study lands in the queue behind bigger jobs.

Do it in-house

Your weeks · your liability

Spreadsheet NEC 220 math from the panel schedule. Nobody has checked it, the AHJ will not take it unsealed, and the liability stays with you.

Wattif load study

From $500 · fixed

Five published prices, sealed from $1,800, metering only where the question needs it. AHJ and utility revisions free until the submittal is accepted.

Two ways to the same sealed answer. Submittable the day it lands.

Order Your Permit Package