Capacity Determination Report, from utility records

Your capacity, from your real demand.

We turn 12 months of utility demand data into measured spare capacity. It routinely recovers capacity the calculation cannot see.

Engineering reportPage 1 of 12

Capacity Determination Report, Panel A

12-month utility record
12-month peak plus margin
361.8 kVA
Spare capacity
207.3 kVA
Verdict on measured demand

Yes. The service can take the new load.

Reviewed and signed by a licensed engineer under their own licenceIn 3 days

The calculation guesses high. Your meter already knows.

12 months of utility demand records hold your real peak. Where your local code accepts measured demand for existing load, that peak with the code's margin stands in for the envelope math. Delivered in 3 days.

  1. 01Send bills + drawings
  2. 02One-line rebuilt, every breaker mapped
  3. 03Measured-demand analysis
  4. 04A licensed engineer signs
  5. 05The determination

When is this ideal for you.

Order the Report →

Adding load at the service level

A demand-metered account with 12 months of history. The measured peak often shows room the calculation cannot see.

You were told you need an upgrade

Before funding a service upgrade, check what the meter actually recorded.

Portfolio screening

Which of your twenty sites can take chargers without upgrades: utility data across all of them, one pass, no site visits.

Capacity From Utility Records | Wattif