Engineering reportPage 1 of 12
Measured Load Study, Panel A
12-month utility record · NEC 220.87
12-mo peak × 125%
361.8 kVA
Spare capacity
207.3 kVA
Verdict · NEC 220.87
Yes. The service can take the new load.
Reviewed and sealed by a licensed Professional EngineerIn 3 days
