Metered Load Study, Panel A
Measured peak 289.4 kVA. The service can take the new load.
The only measured path for feeder and sub-panel additions, and for facilities without usable records. A licensed electrician fits the loggers in under an hour, they record for 30 days at your peak season, and a sealed determination follows once we collect them.
Measured peak 289.4 kVA. The service can take the new load.
Your utility bill sees the whole service, never one panel.
So we clamp the exact feeder the load is going on, for 30 days.
The install is checked on the visit, because a logger only reads back at the end.
A sealed determination follows. About five weeks end to end.
Utility bills only see the whole service. We meter the specific panel the load is going on.
A new tenant, a master-metered space, or an account without demand metering. 30 days of measurement creates the record the code accepts.
The upgrade quote is $60,000 and the utility data is ambiguous. A month of measured truth at the exact panel settles it.