Capacity Determination Report, from on-site metering

No records? We measure it.

The only measured path for feeder and sub-panel additions, and for facilities without usable records. A licensed electrician fits the loggers in under an hour, they record for 30 days at your peak season, and the determination follows once we collect them.

Engineering reportPage 1 of 12

Capacity Determination Report, Panel A

30-day on-site metering
Measured peak
289.4 kVA
Recording
30 days
Verdict on measured demand

Measured peak 289.4 kVA. The service can take the new load.

Reviewed and signed by a licensed engineer under their own licenceDay 36

Utility records see the whole service. Your addition lands on one feeder.

  1. 01

    Your utility bill sees the whole service, never one panel.

  2. 02

    So we clamp the exact feeder the load is going on, for 30 days.

  3. 03

    The install is checked on the visit, because a logger only reads back at the end.

  4. 04

    The determination follows. About 5 weeks end to end.

  1. 01Send photos + drawings
  2. 02Loggers fitted, panel stays live
  3. 0330 days, then we collect
  4. 04A licensed engineer signs
  5. 05The determination

When is this ideal for you.

Order the Report →

The addition lands on a sub-panel

Utility bills only see the whole service. We meter the specific panel the load is going on.

No usable records

A new tenant, a master-metered space, or an account without demand metering. 30 days of measurement creates the record the calculation starts from.

The stakes justify the wait

The upgrade quote is large and the utility data is ambiguous. A month of measured truth at the exact panel settles it.