Capacity Determination Report

Know what your service can carry before you add to it.

Chargers, a heat pump or a new kitchen line all start with the same question. We read what the facility has actually drawn over a year, add the new load the way the code requires, and give you the answer as fits, tight or short.

DeterminationSpecimen

Capacity Determination Report, Main Service

12 months of utility interval data
Existing, measured
220 A
With the new load
360 A
Verdict

Fits, with 40 A to spare on a 400 A service.

Reviewed and signed by a licensed engineer under their own licence

How Capacity Is Counted

There are two ways to establish the load already on a service, and they can give very different answers for the same facility.

Over the topStill spareIt fitsThe service you already haveExisting load, calculatedEVERY LOAD, ASSUMED AT ONCEExisting load, measuredWHAT THE FACILITY ACTUALLY DREWTHE LOAD YOU WANT TO ADD, THE SAME ON BOTH SIDES

A shape, and it describes no particular facility. How much room a measurement shows is a property of the facility.

Calculated, or measured

A calculated method adds up the equipment and applies demand factors. It has to assume a great deal of that equipment runs at once, because it has no record of what actually did.

A measured method starts from the highest demand the facility actually recorded over a year. A service that looks full on paper often carries far less than its calculation says.

We use the measured method wherever the facility has operated long enough to have a record and your local code accepts it, because it is the one that describes the facility as it is.

What Decides the Answer

The year's highest demand

The existing load is the busiest 15 minutes the service carried in 12 months, read from the utility's own record or, where there is none, from 30 days on the panel.

The code's margin

The method your local code accepts for existing load sets the margin added to the recorded peak. The calculation cites the edition the approving authority has adopted.

What you are adding

The new load is calculated under the code's own rules for that equipment, at its full rating unless a listed load management system limits it.

How We Do It

  1. Utility account connected12 months of 15-minute demand, with the tariffHighest demand each month, in amps0100200300JFMAMJJASOND400 A ratingFirst answerHarlow Street MotorsMeasured peak220 ARating400 AWith the chargers360 AVerdictFitsFrom the utility's own record.01 Utility data

    We read 12 months of your utility's interval data first, with no visit, and that gives a first answer.

  2. MAIN 400 ASchedulePanel MDPHarlow Street Motors400 A, 208Y/120 VCKTSERVESBREAKER1Rooftop unit 150 A2Rooftop unit 250 A3Showroom lighting60 A4Lot lighting30 A5Service bay lifts60 A6Air compressor40 A7Offices, parts room100 A8Water heater40 A9Car wash bay40 A10Fire alarm, egress20 A02 Panel record

    We write the panel down circuit by circuit. Sensors go on only where the utility data cannot settle it.

  3. 360 AExisting load plus the chargersMeasured peak220 ACode margin+55 A4 chargers+85 A40 A to spare400 AratingFits03 Calculation

    We add the new load to the measured peak with the margin your code requires, and set the total against your rating.

  4. DETERMINATIONThe service supportsthe chargers.Existing, measured220 AWith the code's margin275 AChargers+85 AHeadroom after40 ASigned by a licensed engineerHarlow Street MotorsE-000CALCULATION1 Maximum demand, 12 months220 A2 Line 1 with the code margin275 A3 4 EV chargers+85 A4 Total, line 2 + line 3360 A5 Service rating400 A6 Spare, line 5 less line 440 AHarlow Street MotorsE-301SINGLE-LINE400 A mainEV, newExisting feedersHarlow Street MotorsE-101PANEL SCHEDULE1Rooftop unit 150 A2Rooftop unit 250 A3Showroom lighting60 A4Lot lighting30 A5Service bay lifts60 A6Air compressor40 A7Offices, parts room100 A11EV chargers, proposedHarlow Street MotorsE-201BASISDemand recordUtility dataMain breaker 400 AField photoRooftop unit nameplatesField photoCar wash bay loadStated by ownerTransformer impedanceUnverifiedHarlow Street MotorsE-401CERTIFICATIONLICENSEDENGINEERSpecimenSignatureDateLicence expiryHarlow Street MotorsE-00104 Review

    A licensed engineer reviews the calculation and signs it under their own licence.

Watch a determination being made →

What You Receive

  1. The verdict

    Fits, tight or short, with the measured peak and the rating behind it.

    In every report
  2. The calculation

    Existing load, the new load and the total against your rating, signed by a licensed engineer.

    From your utility's records
  3. The measurement

    Where the utility cannot see the panel, 30 days are measured on it first.

    From 30 days on the panel

I'm adding load. Will my panel take it? Start with a year of your own demand.

Capacity Determination Report | Wattif