The process / Step 02: Data collection

We watch your panel for 30 days straight.

We capture real kilowatt data at 1 to 15 minute resolution, matched to the question, from exactly what it needs: the mains, one feeder, or several panels across the site.

PANEL A, MONITORINGMAIN, PANEL A412.4 kWFEEDER 4B96.1 kWSUB-PANEL L244.7 kW30 DAYS, REAL kW, 1 TO 15 MIN RESOLUTION
Scoped to the question

A capacity question watches the mains. A question about one feeder watches that feeder.

Resolution

1 to 15 minute kilowatt data, matched to the question your study is answering.

You do nothing

Run the facility as usual. Normal operations are exactly the evidence we want.

Nothing to run

The loggers are ours. No site network to join, no IT ticket, and we collect them when the window closes.

What we capture

Every number was measured on your panel.

Every number in your report traces back to something we actually measured on your panel.

Real kW

not estimates or calculations, actual measured demand

1 to 15 min

intervals matched to your study, and the same interval your utility bills your demand on

Circuit-level

attribution: which circuit, which feeder, which panel drives the numbers

30 days

continuous, the record your local code accepts for existing load and what one site visit can never give you

One report. A definitive answer in 30 days.

Order a Study
Step 02: Data collection | Wattif