The process / Step 01 · Installation

We arrange the install. You barely notice it.

Once you book a study, we handle everything. We schedule a certified local contractor, ship the measurement kit to them, and coordinate the visit around your operations. They clip utility-grade CTs onto your mains and feeders while the panel stays live. Nothing is rewired. Nothing goes dark.

PANEL A · 225A MAINWATTIF-01
We arrange

We book the contractor, ship the kit and set the date. You approve a time window.

Time on site

About 10 minutes per panel. The visit fits inside a coffee break.

Disruption

None. Clip-on sensors go over live conductors. No shutdown, no rewiring.

From that moment

Your panel is online with Wattif. Day one of your 30-day study begins.

Measurement you can defend

Small enough to clip on, accurate enough to defend.

The hardware we ship is the same class of instrument utilities and test engineers rely on, so the numbers in your report hold up to any review.

100 to 1,000 A

clip-on ranges, from one sub-panel to the main switchboard

Live

conductors stay energised. The panel is never taken down to fit a sensor

Cellular

reporting on its own link, with cable temperature read alongside the current

Next in the process:
30 days of evidence.

Book a Study

One report. A definitive answer in 30 days.

Book a Study