The process / Step 01: Installation

We arrange the install. You barely notice it.

Once you order a metered study, we handle everything. We schedule a certified local contractor, ship the measurement kit to them, and coordinate the visit around your operations. They clip utility-grade CTs onto your mains and feeders while the panel stays live. Nothing is rewired. Nothing goes dark.

PANEL A, 225A MAINWATTIF-01
We arrange

We book the contractor, ship the kit and set the date. You approve a time window.

Time on site

Typically under an hour, and the panel stays live throughout.

Disruption

None. Clip-on sensors go over live conductors. No shutdown, no rewiring.

From that moment

Day one of your 30-day recording begins. We come back for the loggers when it ends.

Measurement you can defend

Small enough to clip on, accurate enough to defend.

The hardware we ship is the same class of instrument utilities and test engineers rely on, so the numbers in your report hold up to any review.

100 to 1,000 A

clip-on ranges, from one sub-panel to the main switchboard

Live

conductors stay energised. The panel is never taken down to fit a sensor

Self-contained

records to onboard memory. Nothing to join to your network, and nothing to keep online for 30 days

Next in the process:
30 days of evidence.

Order a Study

One report. A definitive answer in 30 days.

Order a Study
Step 01: Installation | Wattif