Use case · solar and battery
Filing a solar interconnection.
For installers filing utility applications. The load documentation the utility asks for, sealed and attached.
The utility wants numbers, not estimates.
- 01
Interconnection applications ask for the existing service load, documented.
- 02
A demand-metered account: twelve months of records satisfy it in 3 days.
- 03
No usable records? 30 days of metering creates the record the application accepts.
The right study for the application.
Most filings · Measured
From the utility's own records
Twelve months of demand data into the sealed exhibit the application needs. 3 days, no site visit.
Read about it →3 days
No demand metering · Metered
We create the record
30 days on the service, then the sealed determination with the measurement record attached.
Read about it →about 5 weeks