Use case · solar and battery

Filing a solar interconnection.

For installers filing utility applications. The load documentation the utility asks for, sealed and attached.

The utility wants numbers, not estimates.

  1. 01

    Interconnection applications ask for the existing service load, documented.

  2. 02

    A demand-metered account: twelve months of records satisfy it in 3 days.

  3. 03

    No usable records? 30 days of metering creates the record the application accepts.