Use case · heat pumps

Switching to heat pumps.

For decarb mandates and boiler replacements. Heating load lives in winter, and your load study should too.

Heating peaks in January. Summer data cannot clear it.

  1. 01

    NEC 220.87 wants the peak season on record before new load is added.

  2. 02

    Twelve months of utility data already covers last winter: a sealed answer in 3 days.

  3. 03

    No winter record? We time the 30-day metering to your heating season, not the calendar.

Heat Pump Load Studies | Wattif