Use case · heat pumps
Switching to heat pumps.
For decarb mandates and boiler replacements. Heating load lives in winter, and your load study should too.
Heating peaks in January. Summer data cannot clear it.
- 01
NEC 220.87 wants the peak season on record before new load is added.
- 02
Twelve months of utility data already covers last winter: a sealed answer in 3 days.
- 03
No winter record? We time the 30-day metering to your heating season, not the calendar.
The right study for electrified heat.
Winter on record · Measured
Last winter is in your bills
Twelve months of demand records includes the January peak. Sealed in 3 days.
Read about it →3 days
No winter record · Metered
Measured through the cold
30 days on the panel, timed to your heating season, so the peak that matters is the one on record.
Read about it →about 5 weeks
